Welcome to Canada's #1 Hobby Electronic Store!
UNIVERSAL-SOLDER is Canada's favourite source for hobby electronics. We provide parts, kits and modules for hobby and education.
UNIVERSAL-SOLDER is the leading manufacturer of Programmable Logic Controller DIY kits and atomic clock receivers for North America and Europe.
UNIVERSAL-SOLDER offers an exclusive discount program for STEM and technology educational in Canada and the USA.
For best experience visit our website from a desktop browser. This site is not fully optimized for mobile browsers.
On Sale: “Everything Display” – Buy 2 (of the same item) and get 1 Free (of the same item).
-
Nokia 5110 LCD Display 84×48 Pixel – SPI – Backlight
0 out of 5 -
-
Acrylic Enclosure for LCD 1602 16×2
5.00 out of 5 -
8-digit serial LED 7-segment display MAX7219 – 9.5mm
0 out of 5 -
-
Wemos D1 Mini 8×8 LED Matrix Shield TM1640
0 out of 5 -
-
-
SH1106 or SSD1306 OLED I2C 128×64 1.3 inch 3-5V
5.00 out of 5 -
8×8 64-Dot-Matrix MAX7219 (Green) 4 Module Cluster
0 out of 5 -
IPS TFT display round 1.28″ 240×240 GC9A01 controller
0 out of 5 -
WEMOS D1 Mini 8×8 Addressable RGB LED Shield
0 out of 5 -
-
OLED 128×64 Pixel, I2C, 0.96 inch, SSD1306 SH1106, 3-5V
5.00 out of 5 -
8×8 64-Dot-Matrix (Red) MAX7219, 4 Module Cluster
0 out of 5 -
ST7789 TFT IPS Display – 1.3 inch – 240×240 pixel – SPI Interface
5.00 out of 5 -
Wemos D1 Mini OLED Display 0.66 inch with 64 x 48 pixel
5.00 out of 5 -
LCD12864 128×64 Graphic Display SPI – green yellow – ST7920
0 out of 5 -
4 digit LED 7-segment display, serial interface, TM1637
5.00 out of 5 -
16 RGB LED Ring with 16 x WS2812B fully addressable, 68mm
0 out of 5 -
-
24 x WS2812B RGB LED Ring, fully addressable, 86mm
0 out of 5 -
CANADUINO RGB LED Strip with 8 x WS2812B RGB – fully addressable
4.50 out of 5 -
White on Blue Graphic LCD 128×64 with ST7920
0 out of 5 -
-
-
OLED Display 0.96 inch 128×64 with SPI interface – 3-5V
0 out of 5 -
12 RGB LED Ring, WS2812B fully addressable, 50mm
0 out of 5 -
-
2.42″ OLED Graphic Display SSD1309 128×64 SPI Blue
0 out of 5 -
8×8 RGB LED Matrix with 64 x WS2812B RGB – fully addressable
0 out of 5 -
New Arrivals
-
CANADIUNO ESP32-C6 Development Module with 4MB Flash Wi-Fi 6 + BT BLE
0 out of 5 -
-
-
-
CANADUINO® UNO R4 Minima 256kB Flash – 48MHz (compatible with Arduino)
0 out of 5 -
CANADUINO® UNO R4 WiFi 256kB Flash – 48MHz (compatible with Arduino)
0 out of 5 -
Espressif ESP32-C6-DevKitC-1 V1.2 with 8MB SPI Flash Wi-Fi 6 + BT BLE
0 out of 5 -
-
-
2 x Desoldering Wick – Braid (2mm and 3.5mm) 1.5m each
0 out of 5 -
-
-
-
DC Voltmeter Panel Mount 0.56 inch LED 4.5-30V
0 out of 5 -
-
-
-
-
-
-
-
-
-
-
Screw Terminal Adapter for STM32 Blue & Black Pill, Battery Backup
0 out of 5 -
Power Supply USB UART Module for CANADUINO® Permanent Breadboards
0 out of 5 -
-
-
-
HK66T-08 Melody Chip ‘Happy Birthday’ TO-92
0 out of 5