10 x Tactile Push Button 6x6mm THD with long leads

CAD 1.45

Availability: In stock SKU: 70920
Quantity 3 - 9 CAD 1.31
Quantity 10 - 24 CAD 1.27
Quantity 25 + CAD 1.23

Description

Set of 10 pieces Tactile Push Button 6x6mm THD with long leads. Perfect fit for solderless breadboards.

Note: This product was changed from single piece to set of 10 on 12/08/2023.

1 review for 10 x Tactile Push Button 6x6mm THD with long leads

  1. 5 out of 5

    m.p (verified owner)

    These are great because of their pin pitch and small size. The button press has a satisfying click to it, too. The long legs work well in breadboards.
    When I use these near other wires or pins, I put a dab of nail polish on the top and side metal surfaces to prevent accidental shorts.


Add a review