Tactile Push Button 6x6mm THD with long leads
5.00 out of 5
C$ 0.39
Out of stock? Need more?
Click here and let us know.
Availability: In stock
SKU: 70920
Discount Type | Quantity | Volume Price |
---|---|---|
Quantity | 3 - 9 | 7.5% C$ 0.36 |
Quantity | 10 - 24 | 12.5% C$ 0.34 |
Quantity | 25 + | 15% C$ 0.33 |
- Description
- Additional information
- Reviews (1)
Description
Tactile Push Button 6x6mm THD with long leads
Additional information
Manufacturer | CANADUINO |
---|---|
MPN | Does not apply. |
Model Number | N.A. |
SKU | 70920 |
Brand | CANADUINO |
1 review for Tactile Push Button 6x6mm THD with long leads
Add a review
You must be logged in to post a review.
Related products
-
2 pcs Rotary Encoder EC11 Series with Push Button Function
0 out of 5C$ 3.30C$ 1.98 -
Mini Toggle Switch 2 Positions ON-ON 5A – 125VAC – MTS-202
0 out of 5
m.p (verified owner) –
These are great because of their pin pitch and small size. The button press has a satisfying click to it, too. The long legs work well in breadboards.
When I use these near other wires or pins, I put a dab of nail polish on the top and side metal surfaces to prevent accidental shorts.