10 x Tactile Push Button 6x6mm THD with long leads
5.00 out of 5
CAD 1.65
Availability: Only 5 left in stock
SKU: 70920
Discount Type | Quantity | Volume Price |
---|---|---|
Quantity | 3 - 9 | 10% CAD 1.49 |
Quantity | 10 - 24 | 12.5% CAD 1.44 |
Quantity | 25 + | 15% CAD 1.40 |
- Description
- Reviews (2)
Description
Set of 10 pieces Tactile Push Button 6x6mm THD with long leads. Perfect fit for solderless breadboards.
Note: This product was changed from single piece to set of 10 on 12/08/2023.
2 reviews for 10 x Tactile Push Button 6x6mm THD with long leads
Add a review
You must be logged in to post a review.
Related products
-
-
Dual Axis Analog Joystick Module with push button function
0 out of 5 -
2 pieces 4-Way DIP-Switch PCB-Switch Toggle Slider (DIP-8)
0 out of 5 -
-
-
-
-
m.p (verified owner) –
These are great because of their pin pitch and small size. The button press has a satisfying click to it, too. The long legs work well in breadboards.
When I use these near other wires or pins, I put a dab of nail polish on the top and side metal surfaces to prevent accidental shorts.
adam.fraser-kruck (verified owner) –
I love that these fit into a breadboard nicely. Good feel and sound when pressed/released.
I tested five of them to determine their bounce characteristics and they performed quite well. I did 250 presses and 250 releases. The max bounce was 14ms.
Interesting that they barely bounce at all on press (max 32.6 microseconds). All of the bouncing comes from releases.
Full details: https://github.com/adamfk/bouncy-button-data/issues/23