10 x Tactile Push Button 6x6mm THD with long leads

CAD 1.65

Availability: Only 2 left in stock SKU: 70920
Quantity 3 - 9 CAD 1.49
Quantity 10 - 24 CAD 1.44
Quantity 25 + CAD 1.40

Description

Set of 10 pieces Tactile Push Button 6x6mm THD with long leads. Perfect fit for solderless breadboards.

2 reviews for 10 x Tactile Push Button 6x6mm THD with long leads

  1. 5 out of 5

    m.p (verified owner)

    These are great because of their pin pitch and small size. The button press has a satisfying click to it, too. The long legs work well in breadboards.
    When I use these near other wires or pins, I put a dab of nail polish on the top and side metal surfaces to prevent accidental shorts.

  2. 5 out of 5

    adam.fraser-kruck (verified owner)

    I love that these fit into a breadboard nicely. Good feel and sound when pressed/released.

    I tested five of them to determine their bounce characteristics and they performed quite well. I did 250 presses and 250 releases. The max bounce was 14ms.

    Interesting that they barely bounce at all on press (max 32.6 microseconds). All of the bouncing comes from releases.

    Full details: https://github.com/adamfk/bouncy-button-data/issues/23


Add a review